翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Prussian Northern Railway : ウィキペディア英語版
Berlin Northern Railway





}}
}}
}}
The Belin Northern Railway (ドイツ語:Berliner Nordbahn)) is a 223-kilometre-long main line route, that runs from Berlin via Neustrelitz and Neubrandenburg to Stralsund on the Baltic Sea coast. Nowadays, long-distance and regional traffic on the Nordbahn is routed at Hohen Neuendorf onto the Berlin Outer Ring to the Karower Kreuz and on to Berlin Main Station or Berlin-Lichtenberg.
==History==
Construction of the line was preceded by decades of planning from 1843 until 1870 when the newly founded ''Berlin Northern Railway Company'' (German: ''Berliner Nord-Eisenbahn-Gesellschaft'') gained the concessions from the states of Prussia and Mecklenburg-Strelitz. For financial reasons, the company was dissolved on 15 December 1875. The Prussian government acquired the unfinished railway and handed over further construction of it to the Lower Silesian-Markish Railway (''Niederschlesisch-Märkische Eisenbahn'').
The opening took place in three stages:
*10 July 1877: Berlin–OranienburgNeustrelitzNeubrandenburg (134 km)
*1 December 1877: Neubrandenburg–Demmin (42 km)
*1 January 1878: Demmin–Stralsund (47 km)
The construction of the Northern Railway had a significant impact on the villages to the north of Berlin that were in the catchment area of the railway line. In some cases their population multiplied in the following decades. The term Nordbahn became part of place-names (for instance, Glienicke/Nordbahn) and newspapers used its name (''Nordbahn-Nachrichten'').
The Berlin terminus of the railway, but only for freight, was the first freight yard at Eberswalder Straße, now the site of Mauerpark. Passenger services began at the original ''Nordbahnhof'' (''North Station'') in Pankow, today's Wollankstraße station, still evident in the design of the station and its forecourt. At the end of the 19th century the terminus of the railway or passenger trains for Berlin regional services was relocated to the Stettiner Bahnhof (''Stettin''—now Szczecin—''station''), built on Invalidenstraße; the freight remained at Eberswalder Straße.
Up to 1912 separate suburban tracks were built next to the long distance tracks between Gesundbrunnen and Frohnau. At the same time the line was moved to an embankment, to eliminate level crossings. In 1926, the section from Frohnau to Borgsdorf was treated similarly.
In 1925 the suburban services were electrified on the DC system on the section from Gesundbrunnen to Oranienburg. The route later became part of the Berlin S-Bahn. In 1950 the ''Stettiner Bahnhof'' was renamed the ''Nordbahnhof''. Electrical operations continued until the building of the Berlin Wall on 13 August 1961, when the line between Frohnau and Hohen Neuendorf was closed. The Berlin section of the Northern Railway had already been closed for mainline traffic to ''Nordbahnhof'' on 18 May 1952.
Immediately after the wall was built, the S-Bahn between Oranienburg and Hohen Neuendorf became an isolated operation. Subsequently, S-Bahn tracks were built and electrified along the Berlin outer ring between Hohen Neuendorf and Blankenburg. This line was connected in November 1961 to the main S-Bahn network. In Berlin, S-Bahn services continued to Frohnau until the handover of operating rights of the S-Bahn in West Berlin from the East German Railways to the BVG on 9 January 1984. Services were first closed and only resumed on 1 October 1984. Rehabilitation carried out on the S-train tracks in 1985 placed them on a track profile that would make the restoration of the old main line for long distance traffic difficult.
In 1992, the gap between Frohnau and Hohen Neuendorf was closed so that continuous S-Bahn services could resume on the Northern Railway to Oranienburg.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Berlin Northern Railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.